Office fitouts in Melbourne
We design and build your whole office, from an empty floor to the day your team moves in. It's one contract and one small team, from the first site visit to the final walk-through.

When a fitout is the right call
A fitout is the whole office built from scratch: walls, ceilings, floors, joinery, power and data, all planned around how your team works. It's usually the right call when you're moving into a space that needs building out, when the layout no longer suits the business, or when the office is too tired to be worth patching up.
Timing matters too. Most commercial leases in Melbourne run for 3 to 5 years, and you'll usually be working in the office you build for 5 to 10 years, so a new lease or a renewal is the time to do it properly. If your layout still works and only a few areas are letting you down, a refurbishment is usually better value. Our post on fitout vs refurbishment walks through the difference, so you can see which one fits your office.


What's in the price
Our quote covers everything you need to move in and start working on day one: from design and permits through to build and completion. One team looks after all of it, so you're not left coordinating a designer, a builder and a project manager yourself.
A few things sit with your business rather than with us. These are removalists, getting your computers and network running, and connecting your energy and internet. We'll list them from the start, so you know exactly what you're comparing when other quotes come in.
Our cost guide has current ranges per square metre. If you're comparing quotes, how to read a fitout quote explains why two quotes for the same office can be so far apart.
Working back from your lease end
Everything works back from the day your lease ends. The build itself is the shortest part. Finding the right space, getting the design right and waiting on approvals all take longer than most people expect, which is why the fitouts that run most smoothly usually start about a year out.
- 12 months out
Decide whether to stay, move or refurbish. If you're moving, start looking at spaces now. Finding the right one and agreeing the lease both take longer than you'd think.
- About 6 months out
Bring your fitout team on board. This is when the design is done and the permits are lodged. Anything with a long lead time, like glass walls or custom joinery, gets ordered early.
- About 3 months out
The build starts in your new office and usually takes 8 to 14 weeks. Your team keeps working in your current office the whole time.
- Lease end
You move in. If your old office needs a make-good, we can run it alongside, with the same team.
Your completion date is written into the contract. We walk the site with you every week during the build, so you always know where things stand.
Before you sign a lease
The best time to talk to us is before you commit to a building. We'll walk through it with you and tell you how your team would fit, what it will really take to fit out, and whether the building itself will add cost. Older air conditioning, limited power or strict rules on after-hours work can all change the number.
If you're still working out how much space you need, our Area Estimator gives you a starting figure in a few minutes.
A Space Assessment is where that starts. We walk through the space with you and look at how your team would fit, the condition of the building's services, what the lease says about changes and make-good, and whether the space can grow with you. It's free, and there's no obligation.

Fitouts we've built
We've built offices from 350 m² in Collingwood to 1,000 m² in Port Melbourne, and 40 across three states for Asuria. Here are three of them, each a different size.

“I cannot rate Aquilla Interiors highly enough. Andy managed everything for our office relocation of 90 people. From make good of our old premises, to design, construction and project management of the new premises. Andy relieved us of all the stress involved in such a large project. He did everything to stick to the timeline, made sure everything was perfect and the result is amazing. We couldn't be happier. Andy runs a highly professional operation and he is an absolute pleasure to deal with. I highly recommend him.”
Questions we're often asked
How much does an office fitout cost?
It depends on the size and condition of the space, how many rooms you need and the finishes you choose. Our cost guide has current ranges per square metre. Those figures include furniture, so when you compare quotes, check that each one covers the same things.
How long does an office fitout take?
The build itself usually takes 8 to 14 weeks, depending on the size of the space. Design and approvals come first, so allow at least 4 to 6 months from our first conversation to moving in, or around 12 months if you're also looking for a new office.
Can we keep working in our office during the fitout?
Not during a full fitout, for safety. If you're moving, the build happens in your new office, so your team keeps working in the old one until it's ready.
Do you look after permits and landlord approvals?
Yes. Most office fitouts in Victoria need a building permit from a registered building surveyor, and your landlord has to approve the design too. We look after both, which is one more reason to start early.
Can you look after the make-good on our old office?
Yes. We return your old office to the condition your lease requires, and we can run it alongside the new fitout, so you're dealing with one team for both.
Planning a new office?
We'll walk through your space, or the one you're looking at, and give you a straight answer on cost and timing before any drawings are done.


