How to read an office fitout quote

The short answer. A good fitout quote makes three things clear: what's included, what isn't, and which items are allowances rather than fixed prices. Read the exclusions and allowances before the total, check how changes will be priced and agreed, and make sure every quote you're comparing covers the same scope.
Once the quotes arrive, it’s tempting to go straight to the number at the bottom. That’s the least useful place to start. Two quotes can be far apart for perfectly good reasons, or close together while covering very different things, and the total won’t tell you which.
This is how we’d read a fitout quote if we were on your side of the table, including our own.
What should an office fitout quote include?
A fitout quote should set out the scope of work, a written list of what isn’t included, which items are allowances rather than fixed prices, any assumptions the price depends on, and how changes will be handled. It should also say whether the price is ex GST or incl GST.
Most of that sits outside the main price table, in the notes, the exclusions and the fine print. That’s usually where the real differences between quotes are.
Start with the scope, not the total
The scope is the description of what’s actually being built: the partitions, ceilings, flooring, joinery, electrical, data, air conditioning changes, fire services, AV and furniture. Read it against your brief and check that everything you asked for is there.
If something you expected is missing, it isn’t necessarily a mistake. It may be listed as excluded, or simply not mentioned. Either way, it’s worth asking before you compare prices, because a quote that leaves out half the AV will always look cheaper than one that includes it.
Try this: print your brief and tick off each item against the scope in every quote. Anything without a tick is a question to ask.
Read the exclusions first
Every quote has things it doesn’t cover, and a good one lists them in writing. Common ones are furniture, AV equipment, signage, building permit fees, after-hours work, changes to the building’s services, removalists, your own IT setup, and make-good on the office you’re leaving.
None of those are wrong to exclude. What matters is knowing about them now, so they have their own line in your budget and nobody is surprised later. If a quote doesn’t have an exclusions list, ask for one.
What are allowances, and why do they matter?
An allowance is an amount set aside for something that hasn’t been fully chosen or measured yet. You’ll sometimes see them called provisional sums, or prime cost items for things like tapware, appliances or light fittings that haven’t been selected. The final cost can go up or down depending on what’s chosen.
Allowances are normal, especially early on. But a quote that relies on a lot of them, or on low ones, can look cheaper than it will turn out to be. Ask what each allowance is based on, whether it’s realistic for what you want, and what happens if the final cost is higher.
Check the assumptions
Most quotes are built on a few assumptions about the building and the work: that the existing ceilings and services can stay, that the work happens during normal hours, or that the building’s air conditioning has enough capacity for the new layout. If an assumption turns out to be wrong, the price can change.
Ask each company to list its assumptions in plain language. It’s much easier to talk about them now than to find out during the build.
How are changes priced and agreed?
Changes are normal on a fitout. You might add a room, change a finish or move a wall once you see the space taking shape. What matters is how each change is handled.
A good quote explains how changes are requested, how they’re priced, and how they’re approved, and every change should be agreed in writing, with its effect on price and timing, before the work happens. If the quote doesn’t say, ask.
Comparing quotes like with like
When quotes are far apart, the difference usually comes down to scope, allowances or exclusions rather than one company being expensive. A quote that includes screens and video conferencing in every meeting room will be higher than one that lists AV as “by client”. A quote with realistic allowances for joinery will be higher than one with placeholder figures.
The easiest way to compare is to line them up item by item: the same scope, the same exclusions, and allowances adjusted to the same level. Our post on what to look for in an office fitout company covers what else to weigh up beyond the price.
Try this: if two quotes are far apart, ask each company to walk you through the three biggest items in its price. That conversation usually shows you where the gap comes from.
A plain-English glossary of quote terms
Scope of work. The description of what’s being built and supplied. It’s what the price actually covers.
Lump sum. A single fixed price for the work described in the scope. It only stays fixed if the scope does.
Allowance. An amount set aside for something that hasn’t been fully chosen or measured yet. The final cost can be higher or lower.
Provisional sum. A type of allowance for work whose extent isn’t known yet, like repairs to something that can’t be inspected until a ceiling is opened.
Prime cost (PC) item. A type of allowance for something that hasn’t been selected yet, like tapware, appliances or light fittings. The price is adjusted once you choose.
Exclusion. Something the quote doesn’t cover. A good quote lists them in writing.
By client, or by others. Something you’re expected to arrange or pay for yourself, outside the quote. AV, furniture and IT are common ones.
Assumption. A condition the price depends on, like the existing ceilings staying in place or the work happening during normal hours. If it turns out to be wrong, the price can change.
Variation. A change to the agreed scope once the work is under way. Each one should be priced and agreed in writing before it goes ahead.
Ex GST or incl GST. Whether the price excludes or includes the 10% goods and services tax. Check that every quote you’re comparing shows the price the same way before you compare totals.
Questions to ask before you sign
What’s included, and what isn’t? Which items are allowances, and what are they based on? What assumptions does the price depend on? How are changes requested, priced and approved?
A company that’s comfortable with its quote will be happy to answer every one of them. Our office fitout cost guide gives the per square metre ranges, so you can check whether a total is in the right range for your space.
If you’d like a second opinion on a quote you’ve received, feel free to reach out. We’re happy to look over a proposal with you, with no commitment.
Frequently asked questions
What should an office fitout quote include?
The scope of work, a written list of what isn't included, which items are allowances rather than fixed prices, any assumptions the price depends on, how changes are handled, and whether the price is ex GST or incl GST.
What is an allowance in a fitout quote?
An amount set aside for something that hasn't been fully chosen or measured yet, sometimes called a provisional sum or a prime cost item. The final cost can go up or down depending on what's chosen.
Why are two fitout quotes so different?
Usually because they cover different things. The scope, the allowances and the exclusions can vary a lot between quotes, so compare them item by item rather than by the total.
How should changes to a fitout be handled?
Every change should be agreed in writing, with its effect on price and timing, before the work happens. A good quote explains how changes are requested, priced and approved.


