Can you stay in your office during a fitout?

By Aquilla InteriorsPublished 6 minute read

A breakout lounge at PGA Management, with soft grey armchairs, a round timber side table and glass-walled rooms behind

The short answer. Not during a full fitout. For safety, your team will need to work somewhere else while the build happens. A refurbishment is different: depending on the work, it can sometimes be staged area by area, so your team keeps using part of the office. Either way, plan it early and get the plan in writing.

It’s one of the first things people ask when they’re thinking about a fitout of the office they’re already in. The business still has to run, the team still needs somewhere to work, and moving everyone out sounds like a lot.

The answer depends on what kind of work you’re doing. Here’s how we approach it, and how to plan for either case.

Can you stay in your office during a full fitout?

No. A full fitout turns the floor into a building site, and it isn’t safe for a team to work there while it happens. Your team will need to work somewhere else for the length of the build, which usually takes 8 to 14 weeks depending on the size of the space.

During a full fitout, walls come down, ceilings are opened up, and power, data and air conditioning are off for stretches at a time. Trades, materials and equipment move across the whole floor. Even with the best planning, that isn’t somewhere you can take a client call or concentrate on a report, and the build goes faster and more safely with the space to itself.

If you’re moving, this mostly takes care of itself

For many businesses, the question doesn’t come up at all. If you’re moving to a new office, your team keeps working in the current one while we build the new space, and you move once it’s finished.

The timing is the part to get right. You want the new office ready before your current lease ends, without paying rent on two offices for longer than you need to. That’s one reason we suggest starting around 12 months before your lease ends if you’re moving. Our post on how to plan an office fitout sets out the steps in order.

Planning a temporary move

If you’re doing a full fitout of the office you’re in now, the team needs somewhere to go for a couple of months. The common options are a serviced office or coworking space, another site your business already has, working from home for some or all of the team, or a mix of these.

Which one suits you depends on how your team works. A team that mostly works on laptops can often split its time between home and a coworking space. A team with equipment, client meetings or a lot of paper needs somewhere more settled. Allow for the costs as well: the temporary space, moving equipment twice and getting your IT working in both places.

If you’re renewing your lease at the same time, the build period is worth raising with your landlord. A contribution toward the work or some rent-free time can help cover the cost of being out of the office.

Try this: list what your team actually needs to do its work for 2 or 3 months, such as desks, meeting rooms, storage, printers or a reception. That list tells you quickly which temporary option will work.

Can you stay in during a refurbishment?

Sometimes. A refurbishment is more targeted than a full fitout, and depending on the work, it can sometimes be staged area by area. Your team keeps using part of the office while another part is being worked on.

A targeted refurbishment generally takes 4 to 8 weeks, depending on the size of the space, so the disruption is shorter as well. Staging can add a little time, because the work moves around the floor more than once, but it keeps the business running. Noisy work, such as demolition or cutting, may need to be scheduled around your team.

Some stages are easier to live with than others. New flooring in the meeting rooms is easy to work around. A week without the kitchen takes more planning, and it helps to say so upfront. Our post on fitout or refurbishment explains the difference if you’re not sure which one you need.

Try this: mark your busiest weeks of the year on a calendar, such as the end of the financial year, a big launch or a board meeting. Give it to your fitout company before the program is set.

What to ask for in writing

Before the work starts, ask for a plan that shows what happens and when. For a staged refurbishment, that means which areas are worked on in which weeks, when power, data or air conditioning will be off, how your team gets in and around the floor, and when the noisy work is planned. For a full fitout, it means the build dates, so you can lock in temporary space with confidence.

Ask how you’ll hear about changes too. On our projects, the same small team runs everything from the first site visit to the day you move in, with a weekly walk-through during the build, so you always know what’s coming next. You can see how a project is set up on our How a project runs page.

How do you tell your team?

Tell them early, and give them dates. People cope with disruption far better when they know what it’s for and when it ends. A short note covering the dates, what changes for them, who to speak to and what the finished space will give them goes a long way.

Be upfront about the harder parts too, like the weeks without a kitchen or the move to a temporary office. They’re much easier to accept when nobody is surprised by them.

Making the call

If you’re doing a full fitout, plan for your team to be somewhere else while the build happens, and sort that out early. If you’re refurbishing, the work can sometimes be staged so your team stays in, and a written plan makes that much easier to live with.

If you’re weighing it up for your own office, feel free to reach out. We’re happy to look at the space with you and talk through what staying in, or moving out for a while, would look like.

Frequently asked questions

Can you work in an office during a fitout?

Not during a full fitout. For safety, your team will need to work somewhere else while the build happens, which usually takes 8 to 14 weeks. A refurbishment can sometimes be staged area by area, so your team keeps using part of the office.

Can you stay in the office during a refurbishment?

Sometimes. Depending on the work, a refurbishment can be staged so one area is worked on while your team uses the rest. Noisy work may need to be scheduled around your team.

How long does an office refurbishment take?

A targeted refurbishment generally takes 4 to 8 weeks, depending on the size of the space. A full fitout build usually takes 8 to 14 weeks, with design and approvals before it.

Where can our team work during a fitout?

Common options are a serviced office or coworking space, another site your business has, working from home, or a mix. The right one depends on what your team needs to do its work.

Do we need to move out if we're moving to a new office anyway?

No. Your team keeps working in your current office while the new one is built, and you move once it's finished. The main job is timing it so the new office is ready before your lease ends.

Want a straight answer for your own space?

Tell us about your space, your lease and your timing. A first conversation costs nothing, and you'll be talking to the people who would run your project.

Required

Please fill in this field.
Please fill in this field.
Please fill in this field.
Please enter a valid email address.
Please enter a valid phone number, e.g. 0412 345 678.
Your timing (optional)

We'll never share your details. Privacy policy